Saturday 19 November 2016

Week Twenty-Two: Carpet, Waterfall Edges, Driveway Sealed and PCI Booked In

And we're finished. Done. Kaput. The house is complete,  just needs a clean.

We're so thrilled with the finish and quality. Looks absolutely amazing! The carpets were in by Monday of this week. There were people onsite throughout the week sealing the driveway (Gunmetal Grey) and the kitchen bench tops were finally finished on Saturday morning.

We were allowed in to take pictures and it looks simply beautiful. Really happy with how the colours have come together.

The black protective covering on the floors now need to be removed, and house will need a thorough clean before handover.

Wisdom have been in contact and our Practical Completion Inspection is booked in for Wednesday. I assumed that it would be another week or two before handover, but if the PCI goes well, we may end up heading over to head office to sign the paperwork and we'll receive our keys. Wasn't expecting that!

Appliances will be installed at a time to be arranged after handover.

Some photos!

Main Bedroom: Ensuite, Walk in Robe and Sexy Door.

Main Entrance


More Bedroom Shots





Kitchen Waterfall Edges





No comments:

Post a Comment