Friday, 21 October 2016

Week Eighteen: Plumbing, Alarm System, Measuring and Caesarstone

We had trades in on Thursday and Friday today.

The bath has arrived and it looks magnificent. Really thrilled with it. The shower, tap ware and bath spout are installed, as are the toilets in both bathrooms.

The back-to-base alarm has been installed, and the display console is switched on.

Our caesarstone island bench has arrived and is ready to roll. Just have to wait on the flooring.

The glass splash back people arrived and measured up this week.

We've ordered our plantation shutters from a local company and we're looking at 6-8 weeks until installation. Our driveway will start on the seventh of November.

All systems go! Some photos...














Thursday, 22 September 2016

Week Fourteen: Waterproofing, Plumbing/Electrical and Timber Cladding

Still moving along at a good pace but a much slower week than usual. The waterproofing in the wet areas was done this week. We also have had plumbers and electricians in and out getting everything ready for the kitchen/bathroom fit outs next week.

Rocked up today not expecting anything and the timber cladding had been applied. I'm really rapt with how it looks. We'd assumed the cladding would be smooth, but it has a grooved 3D effect. I think it looks amazing.

On school holidays now so looking forward to seeing the progress over the next two weeks :-)

Some pictures...